ING4Trainz
Models of the Irish narrow gauge, GWR broad gauge and a lot more besides!
To download cdp click on button next to model pack
:
If you enjoy these models and wish
to make a donation please send to:
County Donegal Railway
Restoration Ltd
This site is dedicated to the memory of
Great modellers, railway enthusiasts and friends
GWR single-line token apparatus, 5 items Aug 2017
Ricky Sykes and John Maton
My reskin policy is available here
Signal boxes - these can be tailored for specific sites on your routes, they  complement my points cranks, rods and signal wire
Quarter-mile posts, Gradient posts and Single-line Token apparatus
GWR quarter-mile posts set as track objects, set of 4, see video for placement Nov 2025
Great Eastern Railway quarter-mile posts set as track objects, set of 4, see video for placementn Nov 2025
Gradient posts for any region, set of 8, posts and arms as required, see video for placement Nov 2025
Points (turnouts) cranks, rods and signal wire
Point cranks with locking bar, separate models for facing and trailing track, c. 1913, track objects See video for placement Dec 2025
Point cranks extension rods: with standard pulley, with vertical compensator, and 2-rod crossover, c. 1913, scenery items, track objects See video for placement Dec 2025
Cranks for crossing 1, 2, 3 and 4 tracks, c. 1913, scenery items, track objects See video for placement Dec 2025
Signal wire splines, 1, 2 or 3 wires See video for placement Dec 2025
Point rodding splines, 1- 8 rods (kuid2) Revised Dec 2025
Signal wire cranks for crossing track, 1, 2 and 3 wires, left and right hand, track objects. See video for placement Dec 2025
Walkways for crossing 1, 2, 3 and 4 tracks, track objects. See video for placement Dec 2025
Walkway for crossing over point cranks, track object. See video for placement Dec 2025
Walkway for front of signal box, conceals spline ends of point rodding and signal wire, track object. See video for placement Dec 2025
Track ruler, extends across double track, for use in Surveyor, delete after use, track object. See video for placement Dec 2025
Bourton-on-the-water signal box Jul 2015
Princetown signal box May 2016
Signal boxes (cannot be edited)
Install Original Clone and Rename Edit Config Submit Place in route Name
PDF guide to download
GWR signal box 1 24 levers, 21 instruments Feb 2026
GWR signal box 2 20 levers, 21 instruments Feb 2026
GWR signal box 3 24 levers, 22 instruments Feb 2026
GWR signal box 4 72 levers, 57 instruments Feb 2026
GWR signal box 5 36 levers, 29 instruments Feb 2026
GER signal box 1 24 levers, 22 instruments Feb 2026
GER signal box 2 8 levers, 12 instruments Feb 2026
GER signal box 2a 8 levers, 12 instruments Feb 2026
GER signal box 2b 12 levers, 12 instruments Feb 2026
GER signal box 3 32 levers, 22 instruments Feb 2026
GER signal box 4 16 levers, 13 instruments Feb 2026
GER signal box 5 48 levers, 21 instruments Feb 2026
GER signal box 6 4 levers, 8 instruments Feb 2026
Dependencies for signal boxes
Signal box instruments - see below for contents of cdp Feb 2026
Signal box levers - version 2 Feb 2026
Signal box level crossing operating wheel Feb 2026
Webb & Thompson single-line token instrument on cupboard Webb & Thompson single-line token instrument on stand Feb 2026
Tyers electric train staff instrument for single- line working Two Tyers electric train staff instruments for single-line working Feb 2026
Signal box instruments included in cdp
Block bell 1
Block bell 2
Block instrument
Lamp indicator on
Signal repeater distant 1
Signal repeater distant 2
Signal repeater home
Spagnoletti block instrument 1
Spagnoletti block instrument 2
Spagnoletti block instrument 3
Signal box telephone
Track circuit occupied
Track circuit clear
Tyers block instrument
Lamp indicator off
GWR signal box 6 100 levers, 44 instruments Feb 2026
Video guide on YouTube
Signalman Feb 2026
GWR signal box 6 girder dependency GWR signal box 6 end girder dependency
Errant version 1 signal lever black KUID:169585:40608 (35Kb)