ING4Trainz
Models of the Irish narrow gauge,
GWR broad gauge and a lot more besides!
To download cdp click on button next to model pack
:
If you enjoy these models and wish
to make a donation please send to:
County Donegal Railway
Restoration Ltd
This site is dedicated to the memory of
Great modellers, railway enthusiasts and friends
GWR single-line token
apparatus, 5 items
Aug 2017
Ricky Sykes and John Maton
My reskin policy is
available here
Signal boxes - these can be tailored for specific sites on your routes, they
complement my points cranks, rods and signal wire
Quarter-mile posts, Gradient posts and Single-line Token apparatus
GWR quarter-mile
posts set as track
objects, set of 4, see
video for placement
Nov 2025
Great Eastern Railway
quarter-mile posts set as
track objects, set of 4,
see video for placementn
Nov 2025
Gradient posts for any
region, set of 8, posts
and arms as required,
see video for placement
Nov 2025
Points (turnouts) cranks, rods and signal wire
Point cranks with
locking bar, separate
models for facing and
trailing track, c. 1913,
track objects
See video for placement
Dec 2025
Point cranks extension
rods: with standard
pulley, with vertical
compensator, and 2-rod
crossover, c. 1913, scenery
items, track objects
See video for placement
Dec 2025
Cranks for crossing 1, 2,
3 and 4 tracks, c. 1913,
scenery items, track
objects
See video for placement
Dec 2025
Signal wire splines, 1, 2
or 3 wires
See video for placement
Dec 2025
Point rodding splines, 1-
8 rods (kuid2)
Revised Dec 2025
Signal wire cranks for
crossing track, 1, 2 and
3 wires, left and right
hand, track objects.
See video for placement
Dec 2025
Walkways for crossing
1, 2, 3 and 4 tracks,
track objects.
See video for placement
Dec 2025
Walkway for crossing
over point cranks, track
object.
See video for placement
Dec 2025
Walkway for front of
signal box, conceals
spline ends of point
rodding and signal wire,
track object.
See video for placement
Dec 2025
Track ruler, extends
across double track, for
use in Surveyor, delete
after use, track object.
See video for placement
Dec 2025
Bourton-on-the-water
signal box
Jul 2015
Princetown signal box
May 2016
Signal boxes (cannot be edited)
Install
Original
Clone and
Rename
Edit Config
Submit
Place in
route
Name
PDF guide
to download
GWR signal box
1
24 levers, 21
instruments
Feb 2026
GWR signal box
2
20 levers, 21
instruments
Feb 2026
GWR signal box
3
24 levers, 22
instruments
Feb 2026
GWR signal box
4
72 levers, 57
instruments
Feb 2026
GWR signal box
5
36 levers, 29
instruments
Feb 2026
GER signal box 1
24 levers, 22
instruments
Feb 2026
GER signal box 2
8 levers, 12 instruments
Feb 2026
GER signal box 2a
8 levers, 12 instruments
Feb 2026
GER signal box 2b
12 levers, 12
instruments
Feb 2026
GER signal box 3
32 levers, 22
instruments
Feb 2026
GER signal box 4
16 levers, 13
instruments
Feb 2026
GER signal box 5
48 levers, 21
instruments
Feb 2026
GER signal box 6
4 levers, 8 instruments
Feb 2026
Dependencies for signal boxes
Signal box instruments -
see below for contents of
cdp
Feb 2026
Signal box levers -
version 2
Feb 2026
Signal box level crossing
operating wheel
Feb 2026
Webb & Thompson
single-line token
instrument on cupboard
Webb & Thompson
single-line token
instrument on stand
Feb 2026
Tyers electric train staff
instrument for single-
line working
Two Tyers electric train
staff instruments for
single-line working
Feb 2026
Signal box instruments included in cdp
Block bell 1
Block bell 2
Block instrument
Lamp indicator on
Signal repeater distant 1
Signal repeater distant 2
Signal repeater home
Spagnoletti block instrument 1
Spagnoletti block instrument 2
Spagnoletti block instrument 3
Signal box telephone
Track circuit occupied
Track circuit clear
Tyers block instrument
Lamp indicator off
GWR signal box 6
100 levers, 44
instruments
Feb 2026
Video guide on YouTube
Signalman
Feb 2026
GWR signal box 6
girder dependency
GWR signal box 6
end girder dependency
Errant version 1 signal
lever black
KUID:169585:40608
(35Kb)